< Fields BUR

Product Information Sheet
M60 RubrPoly
SEBS 180 Poly BasePly Sheet

USES: M60 RubrPoly is used to construct built-up roofing and waterproofing membranes. These membranes form a water shield over such structures as roofs, foundations, and decks.

DIRECTIONS: Store M60 RubrPoly on end. Keep protected from damage and humidity. To install base sheets with RubrPoly, the substrate is required to be firm, clean, dry, and smooth. Apply the RubrPoly base sheet so that the flow of water is over or parallel to the seams. Lap the RubrPoly 2" on the side laps and a minimum of 4" on the end laps. Extend the RubrPoly to the head of all cants. Secure the RubrPoly to the substrate by either nailing or adhering. For nailed base sheets, use nails with 1" heads and nail the RubrPoly 9" on center on both the outside edges and the seams. Also, nail two rows 12" in from each edge on 18" centers, and alternate the nails in each row so that they are offset from each other. For adhered base sheets, apply either Fields hot asphalt or ambient asphalt and lightly broom the base sheet into the asphalt as it is unrolled. For hot asphalt installations, apply either MT3 RubrPac or T3 MeltPac at the rate of 25 lbs per 100 square feet. For ambient asphalt installations, use either M150 RubrSeal, M100 RubrCoat or F100 PowrCoat at the rate of 5 gallons per 100 square feet. Install an extra sheet of RubrPoly in valleys and waterways. This extra sheet shall extend at least 8" up the inclines of valleys and be applied as specified for adhered base sheets. To install ply sheets with RubrPoly, the base sheet or substrate is required to be firm, clean, dry, and smooth. Apply any one of the following as the ply sheets: M60 RubrPoly, M64 RubrPoly2, F50 PolyShield, F55 PolyShield2, M62 RubrGlas, M66 RubrGlas2, F52 GlasBase2, F56 GlasPly6, or F54 GlasPly4. Install the ply sheets parallel to the base sheet so that the flow of water is over or parallel to the seams. Apply 2, 3, or 4 ply sheets in shingle fashion on the correct laylines. Start by cutting and installing the starter strips and continue by installing the ply sheets in a uniform interply application of either MT3 RubrPac or T3 MeltPac hot asphalt at the rate of 25 lbs per ply sheet per 100 square feet: Or, M150 RubrSeal, M100 RubrCoat or F100 PowrCoat ambient asphalt at the rate of 5 gallons per ply sheet per 100 square feet. Make end laps a minimum of 4", Adjacent end laps shall be offset at least 12" apart. Lightly broom the ply sheets into the asphalt as they are unrolled. To install the surface coating with RubrPoly, the ply sheets are required to be firm, clean, dry, and smooth. Adhere an extra base flashing strip of RubrPoly on all flashings at the same rate of asphalt as required for adhering base sheets. Extend the extra base flashing a minimum of 2" above the head of the cants and a minium of 4" beyond the toe of the cants. Then, uniformly coat the entire surface with any one of the following: MT3 RubrPac, T3 MeltPac, M150 RubrSeal, M100 RubrCoat, F100 PowrCoat, M700 RubrGard, or F700 PowrGard. For hot asphalt coatings, apply 25 lbs per 100 square feet. For ambient asphalt coatings, apply 5 gallons per 100 square feet. For maximum protection and reduced energy costs, apply M800 RubrStar over the asphalt coating. Allow the asphalt coating a minimum of 90 days to set up before applying RubrStar.

DESCRIPTION: M60 RubrPoly is an asphalt coated polyester BasePly sheet. Select raw materials have been formulated into an SEBS rubber asphalt, 180 gram polyester sheet. RubrPoly is a patented breakthrough achieved by Fields in both asphalt coated polyester BUR technology and SEBS chemistry. SEBS rubber polymers are the only ones known to effectively resist the sun's destructive ultraviolet (UV) rays. UV rays bake out the elasticity and destroy the fibers in roofing and waterproofing membranes. Both the polyester and SEBS rubber in RubrPoly provides maximum elastic performance against thermal shock, the daily expansion and contraction of a membrane caused by temperature changes. Membranes made weak from the assault of thermal shock cycles begin to break apart. RubrPoly is your best defense against these attacks. With RubrPoly, your roofing and waterproofing membranes will perform much longer. RubrPoly has an Underwriters Laboratories (UL) Class A Fire Rating when installed in specified systems.

SPECIFICATIONS: M60 RubrPoly exceeds the standards of the American Society for Testing and Materials ASTM D 4601 for base sheets and ASTM D 2178 for ply sheets except ash.

TYPICAL TEST DATA:
Number of Rolls Per Pallet 30
Roll Dimensions and Size 40" x 64.8' = 216 sf
Typical Finished Roll Weight 56 lbs
Net dry mass-coated sheet minimum (lb/100 ft) 14.5
Mass of desaturated polyester mat min grams/sq meter 180
Parting agent and stabilizer max % 65
Asphalt minimum (lb/100 ft2) 7.0

PHYSICAL REQUIREMENTS:
Breaking strength min (lbf/in) logitudinal and transverse 44
Pliability (1/2 in) radius maximum failures, 10 specimens 0

 

M60 MSDS >

About Fields | Services | Product Guide | Advertising | BUR Systems

Copyright 2003 Fields Company, LLC. All rights reserved.